Please install or update your Flash Player plug-in.

The projects

The projects

Filter the projects

Léopold Sédar Senghor Bridge

Creation of a new bridge on the Bras de Pirmil (south) on the east of the Island.

The Bras de Pirmil bridge connects the Quai Dumont d'Urville on the Ile de Nantes to the Boulevard des Pas Enchantés in Saint-Sébastien sur Loire.

The project selected (Marc Mimram Ingénierie/Map/Stucky) is a twin box girder bridge supported by 5 pilings in the Loire. It is 300 m long and 17.15 m wide, accessible to pedestrian, bicycles and vehicles.

 

Type of project : Infrastructure

Planning phase :
Under construction : Mid-2008
Completed : Mid-2010

Surface Area :

Maîtrise d'ouvrage (Owner) : Nantes métropole

Architect / Prime Contractor : Mimram

Financing / Partners : 27 million euros

Contact :

Images diaporama

Newsletter

Subscribe to the newsletter


Unsubscribe